Civil, Electrical, Energy

Maas Energy-Lakeside Hub

Central California

system size

5.13 MW

Number of Panels

9,504

Annual Savings

$850,000

Savings Over System Life

$25,986,017

Payback Period

3.8 years

Return-on-Investment

26.32%

Annual Return Per Acre

$41,214

4.5 MW DC | 4,524 kW | Tracker (SFR) | EPC | 2024

MAAS Lakeside Gas Hub was the third and final project in RSI’s multi-site engagement with MAAS Energy, rounding out a portfolio exceeding 12 MW across three locations. Like its counterparts, this 4.5 MW installation used single-axis tracking and required the full suite of RSI’s in-house EPC capabilities, including medium voltage electrical work and complete permitting management.

Scope of Work
  • Full EPC delivery: engineering, procurement, and self-performed construction
  • Single-axis tracker (SFR) system installation
  • Medium voltage electrical infrastructure
  • In-house permitting, zoning, and utility interconnection
  • Project management, QA/QC, and safety compliance

Approach
Completing the third site in a developer portfolio means maintaining the standards and processes established on the first two while continuing to manage other active projects simultaneously. RSI’s ability to self-perform the full scope, including medium voltage electrical, kept the project on a single chain of accountability. Every required timeline across the MAAS portfolio was met, with no missed contractual or operational completion dates.

Result
Successful on-time delivery of a 4.5 MW commercial solar installation, completing the MAAS Energy portfolio and cementing RSI’s track record as a reliable EPC partner for large-scale developer projects.